One workspace for the entire residential build

Architects, contractors, consultants, suppliers and homeowners work from one project record: drawings, schedule, cost, procurement and approvals, with an AI Copilot that reads all of it.

Professionals on the platform
14,800+
Project value managed
₹9,400 Cr
Median schedule recovered
31 days
Drawing register Villa 27, Whitefield
No.TitleRevStatus
AR-104Ground floor planR4Issued for construction
ST-210Raft reinforcementR2Consultant review
MEP-330Plumbing layoutR3Clash flagged
AR-118Staircase detailsR1Awaiting client
Copilot

MEP-330 R3 clashes with the revised staircase soffit in AR-118 R1. Draft an RFI to the MEP consultant with the affected level noted?

Draft RFI

Six roles, one project record

Not six tools trading files. Each participant gets an interface scoped to what they need, and every action lands in the same audit trail.

  • Architect

    Design intent, drawing issue and client approvals.

  • Consultant

    Structural, MEP and QS responses with turnaround tracking.

  • Contractor

    Daily progress, indents and running account bills.

  • Supplier

    Quotes, dispatch and goods received against indents.

  • Homeowner

    Progress photos, decisions and milestone payments.

  • Developer

    Portfolio cost, schedule and governance.

Built to close the gaps between disciplines

Residential projects go wrong between people: a revised drawing that never reached site, a BOQ that no longer matches the design, a payment released against progress nobody checked. BuildSure keeps every discipline on the same record so those gaps can't open.

Project workspace

Drawings, schedule, BOQ, procurement, site reports and payments share one data model.

Approvals and RFIs

Structured approval chains with due dates, SLA tracking and a decision history you can defend.

Drawing control

Revision-controlled registers so site always builds from the current issued set.

Cost and analytics

Budget, committed and certified cost across every project, with variance explained.

From brief to handover without re-keying anything

  1. 1

    Concept

    Site data, constraints, area statements and the client brief are captured once.

  2. 2

    Design

    Architectural, structural and MEP sets are versioned together with a single approval trail.

  3. 3

    Tender

    Quantities flow into a live BOQ; comparative statements are generated for award.

  4. 4

    Execution

    Progress reports, indents, goods receipts and quality checks update the same ledger.

  5. 5

    Handover

    Snags, warranties and as-built drawings compile into the Digital Property Passport.

Three things that set BuildSure apart

AI Copilot

Ask questions about your project and get answers from its drawings, BOQ, approvals and site reports.

  • How much steel is committed against Block B?
  • Which drawings changed since the last site instruction?
  • Summarise this week for the client.

Digital Property Passport

A permanent record of how the home was built: as-built drawings, material sources, warranties and compliance certificates. It stays with the property when ownership changes.

Integrated marketplace

Procurement starts from your indent. Verified suppliers quote against project quantities, and orders and deliveries settle inside the project.

Frequently asked questions

Is BuildSure a construction company?

No. BuildSure is software. Your practice, contractor and consultants keep their contracts; BuildSure is where the project record lives.

Who usually owns the workspace?

Most often the architect or developer. They invite contractors, consultants, suppliers and the homeowner with role-scoped access.

Does it replace our accounting or CAD tools?

No. Drawings come from your CAD tools and financial entries can be exported to your accounting system.

How long does onboarding take?

A single project can be running in a day. Firm-wide rollouts usually take two to four weeks.

Bring your next project onto BuildSure

Set up a workspace, invite your team and run the whole build in one system.